Our client includes MNC, Public Listed Company, Limited and
Private Limited Company, SME etc. Some of them are - Shell Eastern Petroleum,
ExxonMobil Asia Pacific Pte Ltd, Petrochemical Corporation of Singapore, Tuas
Incinerator Plant, Senoko Power Station, and Seraya Power Station, Fuji Oil Pte
Ltd, City Gas Pte Ltd, SUT Sakra Pte Ltd, Singapore Technology Ltd and many
others. (For details click here)
|
|
|
|
|
Major Projects Completed By Our Key
Personnel
|
Project |
Client |
Year |
|
To carryout maintenance to damage cladding of 60.000
metre height steel chimney included NDT inspection. |
NK Chemicals Pte Ltd
|
February 2003
|
|
External paintings in boiler 3, 4 & 5 to 60.000
metre height RC chimney . |
|
March 2003
|
|
Repairing and replacement to power station building
of 60.000 metre height external cladding wall at boiler unit 9 and
maintenance store building. |
Seraya Power Station Singapore |
July 2003 |
|
Repair and replacement of foam glass insulation to 145.000
metre height steel liner using specialist abseiling technique at Tuas South
Incineration Plant Chimney #1. |
Tuas South
Incineration Plant.
|
July 2003 to August 2003.
|
|
Remove existing sealant joint and reapply of external
aluminum cladding wall sealant joint included anti rust corrosion painting to
steel structural support at General Building Block Jln Ahmad Ibrahim. |
Asia
Pacific Breweries Singapore (Tiger
Beer) |
July 2003 to Septemer 2003. |
|
Repair and replacement of foam glass insulation to
145.000 metre height steel liner using specialist abseiling technique at Tuas
South Incineration Plant Chimney #2.
|
Tuas South Incineration
Plant.
|
Aug 2003 to September 2003.
|
|
Proposed airless spray method for repainting works
to 36.000 metre height two spherical gas holders and repairing to fire
sprinkle line with fire spray nozzle at Senoko Gasworks using specialist
abseiling technique.
|
CityGas Pte. Ltd.
|
September 2003 to October 2003.
|
|
Supply and laying new fire pipeline at Singapore Technologies Kinetics at Jalan Boon Lay.
|
Singapore Technologies
Kinetics Ltd.
|
October 2003 to November 2003.
|
|
Maintenance and cleaning of spherical storage tanks
sprinkler system using specialist abseiling technique |
OilTanking Singapore Ltd |
May 2002 |
|
Installation of ENV sampling points, gantry and
external inspection including NDT testing for 32.000 metre high steel
chimney. |
Asia Pacific Breweries Singapore |
May 2002 |
|
Inspection service internal external inspection
including NDT testing to 42.700m steel chimney |
ISK (S) Pte Ltd Singapore |
April 2002 |
|
Design, fabricate and erection of 35.000 metre
steel chimney. Inspection of two number
steel chimneys |
Fuji Oil (Singapore) Pte
Ltd, Singapore |
January 2002 |
|
Inspection and maintenance during 10 days shutdown,
internal and external 60.000 metre concrete stack. |
Shell Eastern Petroleum,
Singapore |
November 2001 |
|
Inspection and maintenance during shutdown 150.000
metre high concrete stack. |
Tuas Incineration Plant,
Singapore |
September 2001 |
|
Installation and repairing to power station 60.000 metre high boiler
unit external cladding wall and rain water down piping system. |
Seraya Power Station,
Singapore |
September 2001 |
|
Assessing system and inspection to Main Riser and
Vessel at LRCCU Plant. |
Shell Eastern Petroleum,
Singapore |
November 2000 |
|
Maintenance and cleaning of spherical tanks’ sprinkler
system using special abseiling technique. |
Shell Eastern Petroleum,
Singapore |
January – December 2000 |
|
Brickwork liner repairs to APS 1 stack during its
turnaround |
ExxonMobil, Singapore |
October 2000 |
|
Installation of rain cover to two mothballed steel
stacks |
Singapore Aromatics
Company, ExxonMobil, Singapore |
September 2000 |
|
Painting and repair works for 35metre concrete
stack. |
Sugar Plant, Singapore |
February 2000 |